Morrison County Land Services Online Permits
App. Status: Expired
Valid: 10/05/2022 - 10/04/2024Morrison County Land Services
Morrison County Government Center
213 1st Avenue SE
Little Falls, MN 56345
320-632-0170
Project Location
Parcel Associated with this project: |
|
Property zoned as: | Shoreland (SR) |
Is your lot conforming? | Yes |
Type of road that accesses the property: |
Township |
Does the property have an address? |
No |
Existing Septic System on the property? |
No |
Applicant
Applicant Information: |
|
Project Information
ACUB? | No |
Please check all that apply: | Accessory Structures Dwelling Unit / Manufactured Home E911 Address - (including changes) Septic System |
Please describe the project: | To construct a 2560 sq ft shed/house. The house sq footage will be 960 sq ft and the shed portion will be 1600 sq ft. There will also be a wrap around covered porch to be 360 sq ft. Total height of structure to be 22 feet. To install a proper sanitary septic system to include a 1600 gal 2 comp tank w/a 500 sq ft pressure bed. Survey done showing the land is above the BFE, but will need to elevate the structure to meet the RFPE. House is to be built to be 1.5 feet above the BFE or 1116.7 in NGVD 88 datum. This is a split off of parcel number 04.0143.001, sold from Kahl's to Thoma Doc # 589171 |
Building Contractor: | Self |
Estimated Value: | $220,000.00 |
Estimated Completion Date: | 03/01/2023 |
Do you have building plans? | Yes |
Number of Structures
How many accessory Structures? | 1 |
Project Details
What is the square footage of the new dwelling or manufactured Home? | 1320 ft2 | What is the total square footage of the Accessory Structure? | 1600 ft2 |
Setbacks: Property Lines
From Road Right-Of-Way: | 150 Feet | Right Side Property Line: | 408 Feet | Left Side Property Line: | 80 Feet | Rear Property Line: | 538 Feet |
Height of the structure: | 22 Feet |
Setbacks: Other
How Far From A Feedlot? | 0 Feet |
Setback From Ordinary High Water Mark: | 157 Feet |
Setback From Top Of A Bluff: | 0 Feet |
Setback From Wetland: | 335 Feet |
Is your project located within floodplain? | Yes |
Attach Site Plan
Attach a copy of your Site Sketch: |
|
Date site will be staked: | 09/30/2022 |
Building Plans
Building plan upload: |
|
Attach Septic Design
System Type: | I |
What system will be installed? | Mound |
Has a septic system design already been submitted? |
Yes |
Attach Septic Design: |
Terms
SHORELAND (SR) - Min. Lot Size: Pg. 67 (NE, GD, RD & Riparian vs. Non-Riparian Lots)
Minimum Distance From Side Property Line .......................................................... 10 Feet
Minimum Distance from State or County Road ....................................................... 50 Feet from R.O.W.
Minimum Distance from Township Road ................................................................. 30 Feet from R.O.W.
Setback From Top of a Bluff ....................................................................................... 30 Feet
Setback From Rear Property Line (No Lakeshore) ............................................... 35 Feet
Maximum Principal Structure Height ........................................................................ 25 Feet High
Maximum Accessory Structure Height & Size ......................................................... 18 Feet High / 1300 sq ft size
Minimum Distance from General Development Lakes .......................................... 75 Feet from OHW
Minimum Distance from Recreational Development Lakes ................................ 100 Feet from OHW
Minimum Distance from Natural Environment Lakes ........................................... 150 Feet from OHW
Minimum Distance from Forested and Transition Rivers ..................................... 150 Feet from OHW
Minimum Distance from Agriculture, Urban, and Tributary Rivers ...................... 100 Feet from OHW
Minimum Distance from Protected Wetlands ........................................................... 75 Feet from OHW
FEATURE____TANK AREA_____SEPTIC DRAINFIELD
Sandpoint Well / Shallow (less than 50' deep)......................50' .......................... 100'
Deep Well (more than 50' deep)...............................................50' .............................50'
Buildings........................................................................................10' .............................20'
Property Lines / Road Right-of-Way.........................................10' .............................10'
OHWM of: Gen. Dev. & Rec. Dev. Lakes and Streams.......100' .......................... 100'
Natural Environment Lakes and Rivers................................150' .......................... 150'
Mississippi River.......................................................................125' .......................... 125'
Invoice #8045 (09/30/2022)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 09/30/2022 9:02 AM $.10 Per Sq Ft. |
$0.08 | x 1,600 | $128.00 |
added 09/30/2022 9:02 AM $.25 Per Sq Ft. |
$0.25 | x 1,320 | $330.00 |
added 09/30/2022 9:02 AM $225 |
$225.00 | x 1 | $225.00 |
Grand Total | |||
Total | $683.00 | ||
Payment 09/30/2022 | $683.00 | ||
Due | $0.00 |
Approvals
Approval | Signature | Options |
---|---|---|
Applicant | Benjamin Thoma - 09/30/2022 9:40 AM - witnessed by Judy Liddell 6802a5e58af89ac1fd76621ad07c3e3e e723b0ce3d3e9c2134e9c057c8e58c94 | |
#1 Preliminary Office Approval | Judy Liddell - 09/30/2022 9:40 AM f919bdb19dc78e6e0b1e04bd2b58187e af72418be47b920e79075d2817e1fe1c | |
#2 Site Inspected By P & Z Staff | Jeremy Bartkowicz - 10/05/2022 9:19 AM 7da1f9b2d26fd3363ac79acc2c7fda26 69861e6aa8b47fb11ede0a8ca733b071 | |
#3 Morrison County Planning & Zoning | Amy Kowalzek - 10/05/2022 2:16 PM c906c6857219d9b1d596f1f0594f8c67 0fbaa01fc612a1b3e8f65c87b4c609ac |
Text: | |
File(s): |
|
Text: | 10/4/22- I spoke with Rick (surveyor). He provided the elevations for the proposed structure. The LAG is above BFE, but the east side of the shed will need to be elevated to match the west side to get to the lowest floor at the RFPE. DW |
File(s): |
|
Start Date of Permit: | 10/05/2022 |