Morrison County Land Services Online Permits
A) Land Use Permits Land-Use/Septic System Permit Permit # Z-2023-2907, App. # Z-App-5611, UID # 9629
App. Status: Approved
Valid: 05/18/2023 - 05/17/2025Morrison County Land Services
Morrison County Government Center
213 1st Avenue SE
Little Falls, MN 56345
320-632-0170
App. Status: Approved
Valid: 05/18/2023 - 05/17/2025Morrison County Land Services
Morrison County Government Center
213 1st Avenue SE
Little Falls, MN 56345
320-632-0170
Project Location
Parcel Associated with this project: |
|
Property zoned as: | Agriculture (AG) |
Is your lot conforming? | Yes |
Type of road that accesses the property: |
Private Road |
Does the property have an address? |
Yes |
Existing Septic System on the property? |
Yes |
Applicant
Applicant Information: |
|
||||||||||||||||||||||||||||||||||||
Contractor: |
|
Project Information
ACUB? | No |
Please check all that apply: | Accessory Structures |
Please describe the project: | Above ground storm shelter with foundation of approximately 8ft x 12ft size made from ICF concrete forms. Expected to be finished externally with residential siding and residential steel roofing. |
Building Contractor: | self |
Estimated Value: | $6,000.00 |
Estimated Completion Date: | 06/16/2023 |
Do you have building plans? | No |
Number of Structures
How many accessory Structures? | 1 |
Project Details
What is the total square footage of the Accessory Structure? | 96 ft2 |
Setbacks: Property Lines
From Road Right-Of-Way: | 742 Feet | Right Side Property Line: | 230 Feet | Left Side Property Line: | 76 Feet | Rear Property Line: | 42 Feet |
Setbacks: Other
How Far From A Feedlot? | 0 Feet |
Setback From Ordinary High Water Mark: | 0 Feet |
Setback From Top Of A Bluff: | 0 Feet |
Setback From Wetland: | 0 Feet |
Is your project located within floodplain? | No |
Setbacks: Septic System
Distance to the Existing Septic Tank: | 72 Feet |
Distance to the Existing Septic Drainfield: | 115 Feet |
Attach Site Plan
Attach a copy of your Site Sketch: |
|
Date site will be staked: | 05/08/2023 |
Terms
Required Setbacks
AGRICULTURE (AG) - Min. Lot Size = 1 Acre / 150' Width
Minimum Setback from Side Property Lines: 25 Feet
Minimum Setback from Rear Property Lines: 35 Feet
Minimum Setback from Road Right-of-Way: 40 Feet
Animal Holding Area: Side & Rear Property Line Setbacks: 200 Feet
Non-Feedlot Animal Holding Area Side & Rear Property Line Setback: 50 Feet[url=http://www.co.morrison.mn.us/vertical/Sites/%7BC8FCCAFF-AECD-45DC-91B1-016A998EB4A8%7D/uploads/Setback_Requirements.pdf]View Setbacks[/url]
Invoice #8428 (05/07/2023)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 05/07/2023 2:42 PM $80 flat fee |
$75.00 | x 1 | $75.00 |
Grand Total | |||
Total | $75.00 | ||
Payment 05/07/2023 | $75.00 | ||
Due | $0.00 |
Action: Print
Approvals
Approval | Signature | Options |
---|---|---|
Applicant | Daniel M. Ollig - 05/07/2023 2:42 PM ad5fce4f6ef39124dabd9ead2ec87911 bc236aca1ad27d182f5b76cc73b75f89 | |
#1 Preliminary Office Approval | Hannah Kruse - 05/16/2023 11:51 AM d2b9b577d9cac61c19c4150ca19144c4 0dd01aca48e6a286a8f50d95d7d3beb5 | |
#2 Site Inspected By P & Z Staff | Hannah Kruse - 05/18/2023 8:54 AM 5ea5a5051b9104aa32dde1897b14dcf1 e3e553810ee6259717f6b61a52b676e1 | |
#3 Morrison County Planning & Zoning | Amy Kowalzek - 05/18/2023 11:23 AM ebe94f1114192035aa42de4eb8cdc3ca e37a21f795af2260911ca78b21b79336 |
Application has been approved. All signatures have been obtained.
Text: | |
File(s): |
Text: | 5/8/2023 - Brad emailed Motley Township about whether they maintain this portion of Lil Street, and what they consider its end, to determine setbacks. HK 5/16/2023 - Ollig says the portion of Lil St beyond the city boundary is all easements. HK 5/18/2023 - We haven't heard back from Motely Township in ten calendar days, so are proceeding. Site visited 5/17/2023. I took a measurement from the front corner flag to the point where the driveway widens = 46' (see Ollig-RoW and Ollig-Beacon photos). All other setbacks are met. HK |
File(s): |
|
Set a start date for this application on the final approval.
Start Date of Permit: | 05/18/2023 |